figshare
Browse
rspb20181766_si_003.tif (1.06 MB)

Supplemental Figure 2: Box plots showing (A) cost of transport (COT; J kg-1 m-1) and (B) coefficients of variation (〖CV〗*) of stride cycle durations before (black) and after a gait transition (white). from Inter-stride variability triggers gait transitions in mammals and birds

Download (1.06 MB)
figure
posted on 2018-11-16, 16:46 authored by Michael C. Granatosky, Caleb M. Bryce, Jandy Hanna, Aidan Fitzsimons, Myra F. Laird, Kelsey Stilson, Christine E. Wall, Callum F. Ross
Supplemental Figure 2: Box plots showing (A) cost of transport (COT; J kg-1 m-1) and (B) coefficients of variation (〖CV〗*) of stride cycle durations before (black) and after a gait transition (white). Data plotted as median, 10th, 25th, 75th, and 90th percentiles. Open circles represent outliers in the data. Results of non-parametric pairwise comparisons are plotted above each comparison. An asterisk (*) represents P < 0.05, while “ns” represents a non-significant result (P > 0.05). Calculations of 〖CV〗* for each speed were based on 3-12 stride cycle durations depending on the species. Cost of transport for each speed was based on 3-15 trials depending on the species.

History

Usage metrics

    Proceedings of the Royal Society B: Biological Sciences

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC