figshare
Browse

Receding horizon control applied to optimal mine planning

Download (589.83 kB)
journal contribution
posted on 2025-05-09, 23:06 authored by Graham GoodwinGraham Goodwin, Maria SeronMaria Seron, Richard MiddletonRichard Middleton, Meimei Zhang, Bryan F. Hennessy, Peter M. Stone, Merab Menabde
In this paper we show that the problem of optimal mine planning can be cast in the framework of receding horizon control. Traditional formulations of this problem have cast it in the framework of mixed integer linear programming. In this paper, we present an alternative formulation of the mine planning problem using the “language” of control engineering. We show that this alternative formulation gives rise to new insights which have the potential to lead to improved computational procedures. The advantages are illustrated by an example incorporating many practical features of an actual mine planning problem.

History

Journal title

Automatica

Volume

42

Issue

8

Pagination

1337-1342

Publisher

Elsevier

Language

  • en, English

College/Research Centre

Faculty of Engineering and Built Environment

School

School of Electrical Engineering and Computer Science

Usage metrics

    Publications

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC