Beijing construction project pricing basis budget consumption standard (Beijing construction project PBBCS).
journal contribution
posted on 2024-12-31, 18:58 authored by Bai Chongxi, Zhiheng ZhangBeijing construction project pricing basis budget consumption standard (Beijing construction project PBBCS).
History
Usage metrics
Categories
Keywords
limited attention givenapproach reasonably incorporatescarbon emission calculationsrevised model provideslife cycle methodlife cycle analysisrated fuel consumptionfuel consumption standardscarbon emissions increasedfuel consumptioncarbon emissionsproposed methodevaluation modelprocess analysisanalysis revealsemissions withinvehicle idlingtransportation phasetransport vehiclestraffic congestiontheoretical basisroad conditionsprimary sourcefreight vehiclesexcavation engineeringearthwork transportationcase studybeijing sub79 tons02b excavation
Licence
Exports
RefWorksRefWorks
BibTeXBibTeX
Ref. managerRef. manager
EndnoteEndnote
DataCiteDataCite
NLMNLM
DCDC