Fig 6.tif (748.37 kB)
Download file

Smoothed parameter estimates of the industrial electricity demand model.

Download (748.37 kB)
figure
posted on 30.04.2018, 17:27 by Keita Honjo, Hiroto Shiraki, Shuichi Ashina

The gray regions indicate the 95% confidence intervals. The first 17 estimates corresponding to diffuse initial elements are not shown. For the coefficient of the intervention variable, the estimates between January 2010 and March 2016 are shown.

History