pone.0238808.g004.tif (3.36 MB)
Download file

Fig 4 -

Download (3.36 MB)
figure
posted on 2020-09-10, 17:32 authored by Kinga A. Wiśniewska, Sylwia Śliwińska-Wilczewska, Anita U. Lewandowska

48-h air mass backward trajectory analysis (HYSPLIT) for 1st (A), 2nd (B), 3rd (C), and 4th (D) sampling station.

History