posted on 2019-08-23, 17:25authored byDenys Yemshanov, Robert G. Haight, Cuicui Chen, Ning Liu, Christian J. K. MacQuarrie, Frank H. Koch, Robert Venette, Krista Ryall
Colors / shades show the areas surveyed at a particular tree sampling rate and using a particular survey method. X-axis denotes the total budget, $ million, secondary X-axis shows the survey budget portion, $, and Y-axis denotes the survey area, km2: a) surveys based on problem 1 objective; b) surveys based on problem 2 objective; c) surveys in the optimal solution with tree removal.