figshare
Browse
2014-12.AGU.Wee.BelmontForum.v1.1.pdf (1.4 MB)

Proposed Requirements-driven User-scenario Development Protocol for the Belmont Forum E-Infrastructure and Data Management Cooperative Research Agreement

Download (0 kB)
poster
posted on 2015-01-05, 15:15 authored by Brian WeeBrian Wee, Peter Fitch, Nicholas Car, Christoph Waldmann, George Percivall, David Allen

The Belmont Forum E-Infrastructure and Data Management Cooperative Research Agreement (CRA) is designed to foster a global community to collaborate on e-infrastructure challenges. One of the deliverables is an implementation plan to address global data infrastructure interoperability challenges and align existing domestic and international capabilities. Work package three (WP3) of the CRA focuses on the harmonization of global data infrastructure for sharing environmental data. One of the subtasks under WP3 is the development of user scenarios that guide the development of applicable deliverables.

This paper describes the proposed protocol for user scenario development. It enables the solicitation of user scenarios from a broad constituency, and exposes the mechanisms by which those solicitations are evaluated against requirements that map to the Belmont Challenge. The underlying principle of traceability forms the basis for a structured, requirements-driven approach resulting in work products amenable to trade-off analyses and objective prioritization.

The protocol adopts the ISO Reference Model for Open Distributed Processing (RM-ODP) as a top level framework. User scenarios are developed within RM-ODP’s “Enterprise Viewpoint”. To harmonize with existing frameworks, the protocol utilizes the conceptual constructs of “scenarios”, “use cases”, “use case categories”, and use case templates as adopted by recent GEOSS Architecture Implementation Project (AIP) deliverables and CSIRO’s eReefs project. These constructs are encapsulated under the larger construct of “user scenarios”.

Once user scenarios are ranked by goodness-of-fit to the Belmont Challenge, secondary scoring metrics may be generated, like goodness-of-fit to FutureEarth science themes. The protocol also facilitates an assessment of the ease of implementing given user scenario using existing GEOSS AIP deliverables.

In summary, the protocol results in a traceability graph that can be extended to coordinate across research programmes. If implemented using appropriate technologies and harmonized with existing ontologies, this approach enables queries, sensitivity analyses, and visualization of complex relationships.

Funding

US National Science Foundation EF-102980, EF-1138160, EF-1150319, DBI-0752017

History

Usage metrics

    Licence

    Exports

    RefWorks
    BibTeX
    Ref. manager
    Endnote
    DataCite
    NLM
    DC