Flexible job shop with continuous material flow

Version 2 2014-11-26, 15:50
Version 1 2014-11-26, 15:50
dataset
posted on 2014-11-26, 15:50 authored by A. Bożek, M. Wysocki

A new scheduling problem, the continuous flow flexible job shop (CF-FJS) is proposed. The formulation combines the well-known flexible job shop (FJS) problem and a dedicated continuous material flow model (MFM). In the MFM, operations are represented by material flow functions derived by integration of arbitrarily defined speed patterns. Two main concepts of the MFM formalism, i.e. variable speed of processing and continuous material flow, lead to position-dependent processing times and overlapping in operations which extend standard FJS formulation. Properties of the CF-FJS are investigated. A tabu search sched uling algorithm utilising these properties is proposed. Effective neighbourhood functions are defined based on elimination approaches. Two auxiliary procedures: search intensification level switching and fast feasibility detection are added to improve algorithm efficiency. The algorithm is verified using dedicated benchmark instances which comprise non-trivial representations of the CF-FJS specific features, i.e. machine efficiency patterns and minimum inter-operation buffers. The research is motivated by task scheduling in a fastener factory, but the presented results can be useful in many domains, such as production of granular goods, steel details, glass and fluids. The solution can be used in real-world applications. The published results can be helpful in testing new CF-FJS scheduling algorithms.

History